中文字幕无码中文字幕有码在线,亚洲大尺度无码无码专区,日韩毛片无码永久免费看,污亚洲午夜网

山東濟(jì)寧魯星托板有限公司
當(dāng)前位置:供應(yīng)信息分類 > 橡塑 > 塑料建材

平安豆SPC地板石塑地板安裝方法詳解

平安豆SPC地板石塑地板安裝方法詳解 平安豆SPC地板石塑地板安裝方法詳解
  • 平安豆SPC地板石塑地板安裝方法詳解
  • 平安豆SPC地板石塑地板安裝方法詳解
  • 供應(yīng)商:
    山東濟(jì)寧魯星托板有限公司
  • 價(jià)格:
    面議
  • 最小起訂量:
    100片
  • 地址:
    山東濟(jì)寧唐口工業(yè)園
  • 手機(jī):
    18863769217
  • 聯(lián)系人:
    曾經(jīng)理 (請(qǐng)說在中科商務(wù)網(wǎng)上看到)
  • 產(chǎn)品編號(hào):
    120062648
  • 更新時(shí)間:
    2021-06-11
  • 發(fā)布者IP:
    112.235.0.172
  • 產(chǎn)品介紹
  • 用戶評(píng)價(jià)(0)

詳細(xì)說明

  石塑地板怎么安裝Installation of SPC floor

  (一)地面檢測(cè)Ground test

  1、使用溫度濕度計(jì)檢測(cè)溫濕度,室內(nèi)溫度以及地表溫度以15℃為宜,不應(yīng)在5℃以下及30℃以上施工。宜于施工的相對(duì)空氣濕度應(yīng)界于20%-75%之間。Temperature hygrometer were used to detect temperature and humidity, indoor temperature and surface temperature at 15 ℃ advisable, should not be below 5 ℃ and 30 ℃ above construction.For the construction of relative humidity of the air should be between 20% to 75%.

  2、使用含水率測(cè)試儀檢測(cè)基層的含水率,基層的含水率應(yīng)小于3%。

  he moisture content tester were used to detect the moisture content of grassroots, grassroots moisture content should be less than 3%

  3、基層的強(qiáng)度不應(yīng)低于混凝土強(qiáng)度C-20的要求,否則應(yīng)采用適合的自流平來加強(qiáng)強(qiáng)度。Grassroots strength should not be lower than the requirement of concrete strength C - 20, otherwise should adopt suitable self-leveling to enhance strength.

  4、用硬度測(cè)試儀檢測(cè)結(jié)果應(yīng)是基層的表面硬度不低于1.2兆帕。

  With hardness tester test results should be the basic surface hardness of not less than 1.2 million mpa.

  5、對(duì)于石塑地板材料的施工,基層的不平整度應(yīng)在2米直尺范圍內(nèi)高低落差小于2毫米,否則應(yīng)采用適合的自流平進(jìn)行找平。

  Material of construction for SPC floor, base not flatness should be within 2 meters ruler fall of on any account is less than 2 mm, otherwise should adopt suitable self-leveling leveling.

  (二)地坪預(yù)處理Ground level ground preprocessing

  1、采用1000瓦以上的地坪打磨機(jī)配適當(dāng)?shù)哪テ瑢?duì)地坪進(jìn)行整體打磨,除去油漆,膠水等殘留物,凸起和疏松的地塊,有空鼓的地塊也必須去除。With more than 1000 watts of floor polishing machine with appropriate grinding to whole floor polishing, remove paint, glue residue, such as convex and loose plot, free drum plot must also be removed.

  2、用不小于2000瓦的工業(yè)吸塵器對(duì)地坪進(jìn)行吸塵清潔。With not less than 2000 watts of industrial vacuum cleaner dust collection was carried out on the floor clean.

  3、對(duì)于地坪上的裂縫,可采用不銹鋼加強(qiáng)筋以及聚氨脂防水型粘合劑表面鋪石英砂進(jìn)行修補(bǔ)。For the crack in the floor, can use stainless steel reinforcement and polyurethane waterproof adhesive surface of quartz sand to repair

  (三)自流平施工—打底Self-leveling construction - base

  1、吸收性的基層如混凝土、水泥砂漿找平層應(yīng)先使用多用途界面處理劑按1:1比例兌水稀釋后進(jìn)行封閉打底。Absorbent at the grass-roots level, such as concrete, cement mortar screed-coat should use multipurpose interface treatment agent against the water diluted by 1:1 proportion closed render

  2、非吸收性的基層如瓷磚、水磨石、大理石等,建議使用密實(shí)型界面處理劑進(jìn)行打底。The absorptive base such as ceramic tile, terrazzo, marble, etc., it is recommended to use compact type interface treatment agent to render.

  3、如基層含水率過高(>3%)又需馬上施工,可以使用環(huán)氧界面處理劑進(jìn)行打底處理,但前提是基層含水率不應(yīng)大于8%。Such as exorbitant as the moisture content at the grass-roots level (> 3%) and instant construction, epoxy interface treatment agent can be used to render processing, but the premise is the moisture content should not be greater than 8%.

  4、界面處理劑施工應(yīng)均勻,無明顯積液。待界面處理劑表面風(fēng)干后,即可進(jìn)行下一步自流平施工。Interface treatment agent construction should be uniform, without obvious effusion.After being interface treatment agent surface drying, can be the next step of self-leveling construction.

  (四)自流平施工—攪拌Self-leveling construction - stirring

  1、將一包自流平按照規(guī)定的水灰比倒入盛有清水的攪拌桶中,邊傾倒邊攪拌。

  Will combine a pack of self-leveling according to the regulation of water cement ratio of containing water in the mixing barrel, dumping while stirring.

  2、為確保自流平攪拌均勻,須使用大功率、低轉(zhuǎn)速的電鉆配專用攪拌器進(jìn)行攪拌。In order to ensure the self-leveling stir well, you must use high power, low speed electric drill with special mixer to stir.

  3、攪拌至無結(jié)塊的均勻漿液,將其靜置熟化約3分,再短暫攪拌一次。Stir until no caked homogeneous slurry, aged to let stand for about 3 points, stir briefly again.

  4、加水量應(yīng)嚴(yán)格按照水灰比(請(qǐng)參照相應(yīng)自流平說明書)。水量過少會(huì)影響流動(dòng)性。過多則會(huì)降低固化后的強(qiáng)度。Water addition should be in strict accordance with the water cement ratio (please refer to the corresponding self-leveling instruction).Too little water will affect the liquidity.Too much will reduce the strength of the cured

  (五)自流平施工—鋪設(shè)Self-leveling construction - laying

  1、將攪拌好的自流平漿料傾倒在施工的地坪上,它將自行流動(dòng)并找平地面,如果設(shè)計(jì)厚度≤毫米,則需借助專用的齒刮板稍加批刮。Dump self-leveling slurry mixture on the construction of the floor, it will flow and leveling the ground, if the design thickness mm or less, need to use special teeth scraping board a little batch.

  2、隨后應(yīng)讓施工人員穿上專用的釘鞋,進(jìn)入施工地面,用專用的自流平放氣滾筒在自流平表面輕輕滾動(dòng),將攪拌中混入的空氣放出,避免氣泡麻面及接口高差。

  Then should let workers put on special spikes, into the construction of the ground, with dedicated their flat gas cylinder on the surface of self-leveling gently rolling, will stir to mix air release, avoid bubbles pits and interface elevation difference.

  3、施工完畢后請(qǐng)立即封閉現(xiàn)場(chǎng),5時(shí)內(nèi)禁止行走,10時(shí)內(nèi)避免重物撞擊,24時(shí)后可進(jìn)行石塑地板的鋪設(shè)。Please closed the scene immediately after the completion of the engineering project, the five ban when walking, avoid heavy impact within 10, 24 can be carried out after the model, the laid of floor of stone

  4、冬季施工,地板的鋪設(shè)應(yīng)在自流平施工48時(shí)后進(jìn)行。Winter construction, should be in the laid of floor of self-leveling construction after 48.

  5、如需對(duì)自流平進(jìn)行精磨拋光,宜在自流平施工12時(shí)后進(jìn)行。

  If you need to fine grinding and polishing of self-leveling, appropriate in self-leveling construction after 12.